Friday, 14 March 2014

The Locks Begin

Today we started the day with a walk into the local town of Melksham to some stocking up of provisions, including alcohol and chocolate.

Once again it  was foggy but not as bad as the evening before and was  forecast to lift into a sunny day.

Our first lock was only 100 mtrs up the canal and we made it through with out mishap, then it was onto more locks and swing bridges. The fog lifted around 11 am and it was a warm (by English standards)and sunny day. The warmest for the year to date.

With Clyde at the helm and Karen as crew we handled the locks without too much trouble. The Crew certainly had to work hard running from lock to lock opening and closing lock doors and winching sluice gates open and closed, while the skipper maintained control of the boat.
Karen was certainly exhausted by the end of the day, hopefully not too sore tomorrow.

I think for the day we passed through 14 locks and 5 swing bridges, a warm up for tomorrows Caen Hill Flight






No comments:

Post a Comment