Wednesday, 19 March 2014

Down the locks

Yesterday we came down the Caen Hill Locks 22 consecutive locks, Karen once again did most of the lock wok opening, closing winching and running.

 
After the completion of the Caen Hill Locks
 
 

Today was more locks and swing bridges interspersed with the English country side.
We teamed up with another boat and came through most of the locks with another couple. Once again the man was driving and his wife was doing all the lock work. All the boats we passed had male skippers and females doing the lock work?

We stopped at the Barge Inn for a lovely lunch before stopping the night about an hour from the marina where we have to drop the boat off tomorrow morning.

Then it off to Chipping Camden and the start of our Cotswold Walk for 8 days.




Lunch at the Barge Inn
 
 
This boat (below) was hired from the same company as our boat for a weekend stag getaway. Fortunately they headed in the opposite direction to us as they blocked the canal for the rest of the week while cranes were bought in to remove it.
There is a lip on the back of all locks and one of the warnings we were given in our training was to be careful not to catch this on the back of the boat, obviously the boys didn't listen.
 
 
 

No comments:

Post a Comment